Friday, 26 April 2013

With the block now watertight the plaster boarding can begin internally while the bricklayers build up the facework externally with the help of hop-ups which are intermediate levels of scaffolding.

Monday, 15 April 2013

The party wall insulation is installed and held in place with a membrane, loft and ceiling insulation will follow shortly which are held in place by support netting.
 
 

Monday, 8 April 2013

The scaffolding surrounding the block also includes a series of loading bays which assist with getting the windows and bricks to where they are needed.  They are also useful storage on this tight site.
 
 
A close up of the completed tiling with dry verge system which can be seen where the tiles meet at the corners of the roof.  Rather then using mortar this system is mechanically fixed will not require any maintenance.