The feeder pillar is installed with ducting fed into the base in preparation for site electric supplies for external lighting, rainwater harvesting and the TV aerials. It is located in the cycle store and will be fixed in place when the gravel base and concrete is poured.
No comments:
Post a Comment
Note: only a member of this blog may post a comment.