Monday, 3 June 2013

The feeder pillar is installed with ducting fed into the base in preparation for site electric supplies for external lighting, rainwater harvesting and the TV aerials.  It is located in the cycle store and will  be fixed in place when the gravel base and concrete is poured.
 
 

No comments:

Post a Comment

Note: only a member of this blog may post a comment.